Sorry, the search criteria can not be empty
Search

GDKC-2000 Transformer Testing Load Voltage Adjustment Switch Tester by Chongqing Gold Mechanical & Electrical Equipment

  • Item Condition:
  • Brand:
  • Model#:
  • Location:
  • Price:
Chongqing Gold Mechanical & Electrical Equipment
86-23-62940030


Contact the seller Add to Inquiry Cart

Product Description

General Introduction
GDKC Transformer On-load Switch Parameter Tester can record switch operation waveform in overall process. The longest time is 6.4s. It can test various parameters such as transition waveform, transition time, transition resistance and three phase synchronization one time and analyze results automatically. It has power-off protection, over-voltage protection, perpetual clock and high-speed printing.
Technique Index
1.   Three way independent test power, the maximum output current is 0.5A.
2.   Processing part: 80C320 high speed 8 digit microprocessor High speed A/D converter.
3.   The maximum sampling rate can reach 400KHz
4.   Tester set sampling rate:10~20KHz
5.   Maximum save time of single waveform:6.4s
6.   Transition resistance measuring scope:0~40Ω
7.   Measuring precision: no more than 10%
8.   Power supply: 220V±10% power:200W
9.   Size: 410*320*260mm3
10. Weight: 20kg


Item added to Inquiry Cart

Continue shopping Go to Inquiry Cart